1
/
of
6
Wax n Works
WANWAYTECH GPS Pet Tracker Real Time Location With Unlimited Tracking
WANWAYTECH GPS Pet Tracker Real Time Location With Unlimited Tracking
Regular price
$126.99 USD
Regular price
$0.00 USD
Sale price
$126.99 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Track your pet in real time with worldwide coverage and instant safety alerts from GP30 GPS Pet Tracker.
- Global, real-time location with unlimited tracking via built-in IoT SIM across 4G LTE Cat 1 bands (B1/B2/B3/B4/B5/B7/B8/B20/B28/B66/B41); view live position and movement history in TrackerOne, anytime, anywhere.
- Long-lasting power and easy charging: 800mAh, 3.8V battery delivers 30+ hours per charge; rechargeable via magnetic charger with low-power alerts below 5%.
- Safety features you can count on: geofence with instant alerts, sound/light search, and IP67 waterproofing for rugged outdoor use.
- Pet-ready and hassle-free: suits pets over 4 kg, weighs 1.34 oz, silicone clip, pre-installed SIM with 1-year service, free SIM card, and no monthly fee (renewal $74.99).
Share
